Summer Toboggan Run - References
more than 240 rides Worldwide
Whether in combination with other facilities or as a stand-alone attraction - a summer toboggan run enriches the tourist offer of your region . A well-developed tourist infrastructure as well as proximity to a busy road are important advantages for its successful operation.
The Summer Toboggan Run is a sports facility that requires the tobogganist to actively participate in the action, because he or she brakes or "steps on the gas" and thus determines the style and duration of the ride.
Our references in detail
Select the desired country in the drop-down list
Atzmännig
Carrier: | Atzmännig AG, 8638 Goldingen |
Year of construction: | 1977 |
Length: | 700 m |
Uplift system: | Chairlift |
Atzmännig
Carrier: | Atzmännig AG, 8638 Goldingen |
Year of construction: | 1984 |
Length: | 750 m |
Additional info: | Extension of the existing toboggan run |
Uplift system: | Chairlift |
Internet: | http://www.atzmaennig.ch |
Davos
Carrier: | Davos Schatzalp Bahn AG, 7270 Davos Platz |
Year of construction: | 1989 |
Length: | 470 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.schatzalp.ch |
Engelberg
Carrier: | Luftseilbahn Engelberg-Brunni AG, 6390 Engelberg |
Year of construction: | 1991 |
Length: | 500 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.brunni.ch |
Grindelwald
Carrier: | Luftseilbahn Grindelwald-Pfingstegg AG, 3818 Grindelwald |
Year of construction: | 1999 |
Length: | 610 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.pfingstegg.ch |
Gurten
Carrier: | Gurtenbahn Bern AG |
Year of construction: | 2016 |
Length: | 500 m |
Uplift system: | Wiegand-Lifter |
Internet: | http://www.gurtenpark.ch |
Hochstuckli
Carrier: | Skilift & Sesselbahnen AG, 6417 Sattel-Hochstuckli |
Year of construction: | 1993 |
Length: | 430 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.sattel-hochstuckli.ch |
Kandersteg
Carrier: | Sesselbahn Kandersteg-Oeschinen AG 3718 Kandersteg |
Year of construction: | 1995 |
Length: | 920 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.kandersteg.ch |
Kornsackrutsche Schongau
Carrier: | Schongi-Land AG, 6288 Schongau |
Year of construction: | 1991 |
Length: | 303 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.schongiland.ch |
Langenbruck
Carrier: | Solarbob AG Langenbruck, 4710 Balsthal |
Year of construction: | 2001 |
Length: | 760 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://deinkick.ch/ |
Pilatus
Carrier: | Skilift Fräkmünt AG, 6052 Hergiswil |
Year of construction: | 1996 |
Length: | 1070 m |
Uplift system: | Skilift with towing line |
Internet: | http://www.pilatus.ch |
Rellerli, Schönried
Carrier: | Rellerli Luftseilbahn und Skilifte AG, 3778 Schönried |
Year of construction: | 1994 |
Length: | 621 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.loetschberger.ch |
Sörenberg
Carrier: | Rodelbahn Rischli Sörenberg |
Year of construction: | 1994 |
Length: | 860 m |
Uplift system: | Skilift with towing line |
Internet: | http://www.soerenberg.ch |
Vue des Alpes
Carrier: | RHW Marketing GmbH, 2520 La Neuveville |
Year of construction: | 2003 |
Length: | 448 m |
Uplift system: | Wiegand-Lifter with towing line |
Internet: | http://www.toboggans.ch |
Wirzweli
Carrier: | Luftseilbahn Dallenwil-Wirzweli AG |
Year of construction: | 1989 |
Length: | 330 m |
Uplift system: | 2 Wiegand-Lifter with towing line |
Internet: | http://www.wirzweli.ch |