Summer Toboggan Run - References
more than 240 rides Worldwide
Whether in combination with other facilities or as a stand-alone attraction - a summer toboggan run enriches the tourist offer of your region . A well-developed tourist infrastructure as well as proximity to a busy road are important advantages for its successful operation.
The Summer Toboggan Run is a sports facility that requires the tobogganist to actively participate in the action, because he or she brakes or "steps on the gas" and thus determines the style and duration of the ride.
Our references in detail
Select the desired country in the drop-down list
Chatham
| Carrier: | John Nike Leisuresport Ltd., Bracknell |
| Year of construction: | 1999 |
| Length: | 550 m |
| Uplift system: | Wiegand-Lifter with towing line |
| Internet: | http://jnlchatham.co.uk/tubing/ |
Duporth Holiday Camp
| Carrier: | Haven Warner, Hemel Hemstead/Herts HB1-1DJ |
| Year of construction: | 1993 |
| Length: | 250 m |
| Uplift system: | Wiegand-Lifter with towing line |
Ebbw Vale
| Carrier: | Garden Festival Wales Ltd, Ebbw Vale |
| Year of construction: | 1992 |
| Length: | 355 m |
| Uplift system: | Wiegand-Lifter with towing line |
Harcourt Sands Holiday Village
| Carrier: | Haven Warner |
| Year of construction: | 1993 |
| Length: | 170 m |
| Additional info: | - dismantled |
| Uplift system: | Wiegand-Lifter with towing line |
Llandudno
| Carrier: | Llandudno Ski Centre John Nike Leisuresport Complex |
| Year of construction: | 1987 |
| Length: | 510 m |
| Uplift system: | Wiegand-Lifter with towing line |
| Internet: | http://jnlllandudno.co.uk/tubing/ |
Oakwood-Park
| Carrier: | Oakwood Leisure Ltd, Milford Heaven |
| Year of construction: | 1986 |
| Length: | 275 m |
| Uplift system: | Wiegand-Lifter with towing line |
Pembrey
| Carrier: | Llanelle Borough Council |
| Year of construction: | 1993 |
| Length: | 428 m |
| Uplift system: | Wiegand-Lifter with towing line |
Plymouth
| Carrier: | John Nike Leisuresport Ltd, Plymouth PL6 8QLB |
| Year of construction: | 1998 |
| Length: | 504 m |
| Uplift system: | Wiegand-Lifter with towing line |
| Internet: | http://jnlplymouth.co.uk/tubing/ |
Robin Hill
| Carrier: | Robin Hill Adventure Park, Mr Bennis, Isle of Wight PO30 2NY |
| Year of construction: | 1990 |
| Length: | 440 m |
| Uplift system: | Wiegand-Lifter with towing line |
| Internet: | http://www.robin-hill.com/ |
Swadlincote
| Carrier: | John Nike Leisuresport Complex Swadlincote Ski and Snowboard Centre |
| Year of construction: | 1992 |
| Length: | 450 m |
| Uplift system: | Wiegand-Lifter with towing line |
| Internet: | http://jnlswadlincote.co.uk/ |
Windsor Safari Park
| Carrier: | Windsor Safari Park, Winkfield Road, Windsor |
| Year of construction: | 1987 |
| Length: | 2 x 400 m |
| Uplift system: | 2 Wiegand-Lifter with towing line |
| Internet: | http://www.windsorsafaripark.org.uk |
Woodlands
| Carrier: | Woodlands Leisure Park, Blackatown, Devon |
| Year of construction: | 1995 |
| Length: | 403 m |
| Uplift system: | Wiegand-Lifter with towing line |



